Why the Cheapest Quote Is Usually the Most Expensive Project

Answers cheapest video editing quote risks

Three written quotes laid out side by side on a dark desk

This gets written as a defence of high prices, which is not worth reading. The useful version is mechanical: a low quote is a quote with something taken out, and the only real question is what, and who pays when it turns out to be needed.

The four things usually left out

The structure work. A quote for "editing, four days" that assumes the structure exists. When it does not, as is usual, the days are absorbed or the film is cut to a structure nobody chose. The symptom is a first cut that comes back with "this isn't quite it" and no clear reason why.

The second version. One deliverable quoted, three needed. Every aspect ratio, every cut-down, every language is work. The cheap quote is often cheap because it prices one thing.

The finishing. Grade, mix, graphics. Sometimes excluded deliberately, sometimes just not considered. An ungraded, unmixed cut delivered as a finished film is how a project ends up looking cheap in a way no one can name.

The rounds. One round of notes included, five needed. This is where a low quote stops being low, and it is the most common reason a fixed figure grows by half.

What it costs to add back later

Adding something mid-project is always more expensive than including it, for a structural reason: at the start the work can be planned around it, and later it has to be squeezed in.

  • Structure found late: a re-cut, and every hour already spent is partly wasted
  • A version added at the end: a second deliverable built from scratch rather than derived
  • A grade added after the cut: mostly fine, if it was shot for it
  • Notes beyond the included round: on the meter, at the least convenient moment

How to compare two quotes properly

Do not compare totals. Compare line by line:

  • How many days, and what is each one for? A quote with no days in it has no plan in it.
  • How many versions, and which aspect ratios? The single most common omission.
  • Is grade and mix included? Often a third of the work.
  • How many rounds, and what counts as one? The most common source of overrun.
  • What is not included? The line that tells you the most.

A quote with a clear "not included" list is more trustworthy than a lower one without it, because the supplier has thought about where the edges are.

What a cheap quote is actually good for

A genuinely low quote is sometimes correct: a simple job, a repeat client, a piece that is genuinely easy, a new supplier building a portfolio. None of those are dishonest.

The failure mode is not a low quote. It is a low quote offered for a job that was described as complex, which means either the supplier did not read the brief or did not believe it.

The version for a buyer

Ask each supplier what they have excluded. The answers separate them faster than the totals do, and the one who names the most exclusions is usually the one who will not surprise you.

If you have two quotes and cannot tell what is missing, send both and the answer will be which one is describing which job.