Do You Pay for Revisions, or Are They Included?
Answers are revisions included in video editing price

Every quote includes revisions and almost no quote defines them, which is why this is the most common argument in post-production. The number of rounds is not the useful part of the answer. What counts as a change is.
Why one round is standard
A cut is a proposal. The first response to a proposal is usually a correction, and an editor who charges for that is charging for the client having looked at the work. So one round is included, and it is expected to be substantive.
After that, the honest distinction is not whether it is a revision but what moved.
The three kinds of change
Type one: execution. The cut is right and something is wrong. A shot is too dark, a name is spelled wrongly, a line is clipped, the music is too loud. These are the editor's to fix, at any stage, at no cost. Any argument here is a bad sign.
Type two: refinement. The cut is right and the detail is not. This shot is a beat too long, this line would be better later, the transition is distracting. This is the included round, and a second one of these is normal on a brand job.
Type three: direction. One of the four decisions changed. The film is now for a different audience, or the one thing it was saying has changed, or the ending asks for something else. This is not a revision of the edit. It is a new edit, and pricing it as a revision is how a project loses money.
The test that settles it
Ask: if I make this change, does anything else have to be redone?
Change a shot: no. Change the structure: yes, the pacing, the music, the graphics and the grade all follow. Change the ending: the whole back half follows.
A change with no knock-on effect is a revision. A change that drags four other things with it is a scope change, and the honest thing is to say so when it arrives rather than at the end.
What to put in a quote
- the number of rounds included, and what a round means
- that execution fixes are unlimited
- what starts a new charge: a change to the audience, the message, the ending, or the length
- how a new charge is calculated: a fixed figure for a named change, not an open hourly meter
The last point matters more than it looks. "Additional revisions at an hourly rate" is an argument in installments. "A change of ending is X" is a decision the client can make with a number in front of them.
What to do when the scope genuinely changes
Name which of the four decisions moved, price that change alone, and let the client decide whether it is worth it. It frequently is not, and saying so protects the budget for the things that are.
Most projects that run over do so because a direction change was absorbed silently and then appeared as a larger invoice later, which feels to the client like a trap even when every hour was worked.
The version for a buyer
Ask, before the job starts: how many rounds, what counts as a round, what happens if the structure changes, and what a change of ending costs. A supplier who answers all four in one sentence has done this enough times to be worth the risk.
If a project is at the stage where these questions are live, the brief is the place to settle them, and the quote will name the assumptions rather than the hopes.